Title: Air Handling Unit Operation and Monitoring
|
|
Approx. time
|
Objectives
|
Purpose: Engineering USP on Energy Efficient Building
|
|
Equipment
& Supplies
|
|
·
Checklist
·
Log book
·
Standard
Basic Tools
·
BMS
|
|
PROCEDURES
|
|
15min
Total
time
|
·
Closely monitor BMS system round the clock
·
Set the timers as per requirements & temperature in relation to
prevailing seasonal conditions
·
Ensure all AHUs &FAHU are functioning according to the BMS setting
in automatic mode
·
Do not change/alter any setting without prior approval from CE/SUP
·
Air-conditioning temperature can be changed as per Guest’s preferences,
documented in BMS communication logbook & adjust to original setting
after Guest leaving
·
Ensure all AHUs,FAHUs, FCUs & exhaust system are properly working
·
Ensure to change the filters & clean the air intake
·
Inspect all motorize valves & temperature gauges
·
Inspect condenser drain pan for proper drainage
·
Inspect blower motors for excessive noise & vibration
·
Secure loose guards & panels
·
Inspect pulleys & belts regularly
·
Inspect safety controls & equipment’s
·
Inspect coil & discharge
·
Inspect heating system
·
Ensure the damper operations & fire mode are in good condition
·
Ensure the plant room unit is in good condition & must be cleaned
at all times
·
If the unit is ceiling mounted ensure to check all the mounting
fasteners are securely fixed. Flat forms are well secured and clear from any
blockings.
·
Check all electrical hardware, connections & running amperes
regularly
·
Any damage items needs to be changed immediately
·
All maintenance activities must be logged & input into Mini
Maintenance system & resolved as per Reactive Maintenance SOP
|